Empire Portfolio

Trident Building Consultancy was appointed to carry out technical due diligence in connection with the acquisition of a substantial mixed use portfolio located throughout the country.

Trident completed technical due diligence building surveys along with reinstatement cost assessments over 49 sites which totalled almost 200 buildings with a cumulative floor area of 2.8m ft². In addition to carrying the building survey and reinstatement exercise Trident also managed sub consultants engaged to provide area measurement reports and phase 1 environmental surveys as part of the instruction. At a later point Trident also managed the procurement of EPC’s for the portfolio.

All surveys, assessments and reports were completed within the required six week period and our appointing client successfully acquired the portfolio.

Sign up to our Newsletter