1 Mabledon Place

Trident was appointed by HSL FM LLP as Project Manager and Cost Consultant for category B fit out of circa 130,000ft² to provide pathology laboratories, office space and support accommodation.
• A first of type, largest of type independent automated tracking system spanning five storeys, which has to be integrated within the architecture, structure and engineering of the building;
• A centralised molecular suite, ensuring the laboratory is configured on a platform basis rather than a discipline basis;
• Two containment level three laboratories each measuring c80 square metres;
The facilities include:
• M&E Services upgrades to provide resilience for 24 hr working
• One of the largest automated labs in Europe
• Containment Level 3 Suite
• Cellular Pathology
• Microbiology
• Call Centre
• Finance and TDL Executive Offices

Sign up to our Newsletter